Qingdao kitchen waste treatment project is located in Xiao Jianxi solid waste comprehensive treatment park in Chengyang District, covering an area of 32810.6 square meters, District, covering an area of 32810.6 square meters, with a total investment of 383.69 million yuan. The project adopts the process of "kitchen waste pretreatment+dryanaerobirc dige stion',witha designed processing capacity of 500 tons/day.to receive andtreat the kitchen waste generated in Qingdao.
Read More